Protects the battery.
Cell voltages, temperatures, balancing and trips. It keeps the pack safe. It does not decide when the pack should work.
Your battery vendor
Solar · Storage · EMS · AI
Myto is the intelligence layer that continuously optimises energy assets across generation, storage, consumption, grid and market conditions.
Energy is abundant.
Intelligence is the multiplier.
Building capacity was the first problem. Operating it well, hour by hour, against forecast, constraint and price, is the one the next decade turns on. What follows is how.
From data to decision
Monitoring stops at the first two. Control adds the fifth. Myto runs the whole loop and keeps a record of why each action was taken.
Inverters, BMS, PCS, meters and chargers read at the edge every second, over standard industrial protocols.
Raw points become one model of the site: state of charge, headroom, load, limits, alarms.
Load, generation and price over the next blocks, with backtesting before a model is trusted.
A schedule that respects the envelope and prices each battery cycle before spending it.
Setpoints issued by the edge controller. Shadow mode by default; live control is armed explicitly and audited.
Planned versus actual, block by block. Forecast models are promoted or rolled back on measured accuracy.
Monitoring
Tells you what happened. The decision is still made by a person, later, usually on a spreadsheet.
EMS
Keeps the site inside its limits in real time. Reliable, but it follows rules set in advance and knows nothing about price or forecast.
Myto Intelligence
An EMS at the edge, with forecasting, optimisation and market awareness above it. Real-time control plus a view of what the next few hours are worth.
One intelligence layer
Optimising each asset on its own gives answers that look right locally and cost money overall. Myto models the site as one system and decides for all of it at once.
Generator control is by design: diesel sets are part of the site model today, and dispatch is scoped with each project.
Where intelligence sits
Vendors often bundle them and call the result an EMS. They answer different questions, and a site needs all four.
Cell voltages, temperatures, balancing and trips. It keeps the pack safe. It does not decide when the pack should work.
Your battery vendor
Telemetry, alarms and operator commands. It shows what is happening and lets a person act on it.
Often existing on site
Setpoints every second: export limits, peak shaving, charging windows, plant envelope. Keeps the whole site inside its limits.
Myto · available
Forecast, price, degradation and schedule weighed together to choose the next action and record why.
Myto · by design
Solutions
Each solution uses the same model of the site, the same edge controller and the same decision record.
Edge control on a one-second cycle, with safe local fallback when the cloud link drops.
Self-consumption, export limits and curtailment-aware storage, with or without batteries.
Monitor, understand, predict, optimise and protect. Every cycle priced before it is spent.
IEX prices, 96-block scheduling and DSM exposure, built around India's market structure.
Campus and site microgrids coordinated as one system behind a single connection.
Charging shifted toward solar surplus and away from the intervals that set the bill.
Real-time operations
Power runs in the direction of the dashes, and their speed follows the MW. Drag the slider to move through the 96 fifteen-minute blocks of the day.
A conceptual single-line diagram of solar, storage, grid, load and EV charging on one site bus, controlled by the Myto EMS.
Simulated values · illustrative C&I site: 10 MWp solar, 4 MW / 16 MWh storage, 3 MW export limit · conceptual diagram, not a live dashboard
How it decides
Every interval admits many actions and almost all of them are worse. Myto scores them against generation, demand, state of charge, grid headroom and price, commits to one, and records what drove it.
A lattice of admissible dispatch routes, with the selected route illuminated as conditions change.
Conditions
Actions considered
Committed action
Export solar
Because
Simulated conditions on an illustrative system. The policy shown is a simplified version of the trade-off the optimiser makes. It is not a deployment record.
Decision trace
Every control action is written to an audit log with who or what issued it. An operator who cannot see why an action was taken will eventually override it, and should. Illustrative trace.
India's power system
Fifteen-minute blocks, state-by-state tariffs, deviation settlement, open access and an exchange with four day-ahead and real-time segments. Myto models them as part of the site, not as an add-on.
Myto reads published exchange data. It does not submit bids to any exchange today.
A globe with India as the origin point and connections extending to the Middle East, Southeast Asia, Europe, Australia, Africa and the Americas.
Energy has a financial layer
The same megawatt-hour is worth different amounts at different times. The outcomes below are what Myto is designed to create. We publish numbers only once they are measured on a real deployment.
Peak intervals covered before they set the demand charge, and tariff windows planned rather than reviewed on the bill.
Storage cycled when the spread beats the cost of degradation, and held when it does not.
Solar that would be curtailed at the export limit is stored for later use instead.
Block-level planned versus actual, so deviation is visible while it can still be corrected.
Arbitrage, peak management, firming and reserve compared against each other rather than fixed as modes. Applicable based on project, market and regulatory conditions.
Every control action logged with its source, so lenders, offtakers and operators can see how the asset is run.
These describe intent, not measured performance. Where we show numbers on this site they are labelled simulated or illustrative.
Platform
Myto does not make batteries, inverters or meters. It connects to the ones you have, models them as one system, and runs at the edge with the cloud above it.
Configurations
The same platform covers each of these. What changes is which decisions matter most.
Self-consumption first, export held inside the limit, curtailment made visible.
AvailableSurplus stored instead of curtailed, released into the evening peak, each cycle priced.
AvailableTariff and price-driven scheduling with degradation cost, reviewed in shadow mode first.
By designCharging steered toward solar surplus and away from the intervals that set the bill.
By designGenerator starts coordinated with storage and solar to cut running hours.
By designMultiple edge controllers in one fleet view with shared alarms and reporting.
AvailableProof, not promises
We do not publish customers, capacities or savings until they are confirmed and measured. What we can show you today:
What could Myto optimise?
Tell us what you operate: the assets, the constraint that binds, and what you are optimising for. The two-minute assessment shows where the decisions are. It does not estimate savings.