Myto / Solutions / Power Intelligence

Global energy intelligence. Engineered for India's power system.

India settles power in fifteen-minute blocks, prices it on an exchange with several segments, penalises deviation from schedule, and changes tariffs at every state border. Power Intelligence is built around that structure instead of being adapted to it later.

IEXDAM · RTM · GDAM · HP-DAMDSMSLDC · RLDC · NLDCOpen access

The market, term by term

What each part is, and what Myto does with it.

Myto reads published exchange data and plans against it. It does not submit bids to, or trade on, any exchange today.

AvailableBy design
TermWhat it is · what Myto doesStatus
IEX DAMDay-ahead market: prices for each 15-minute block of tomorrow. Myto reads published prices and uses them to plan the next day's schedule.Available
IEX RTMReal-time market, cleared through the day. Prices read in on the same 96-block structure for intraday re-planning.Available
IEX GDAMGreen day-ahead market for renewable energy. Prices read in alongside DAM.Available
IEX HP-DAMHigh-price day-ahead segment for costlier generation. Prices read in alongside DAM.Available
Bid preparationA bid ladder from the storage schedule and reservation price, saved as a draft for review and export.By design
Bid submissionSubmitting bids to the exchange. Requires regulatory and member arrangements; not part of the platform today.By design
DSMDeviation settlement: charges for actual differing from schedule. Myto estimates exposure per block at your configured rate. It is not a certified settlement engine.By design
SLDC · RLDC · NLDCState, regional and national load despatch centres. Schedules are built on their 96-block IST day, and an IEC 60870-5-104 outstation provides SLDC-style telemetry.Available
Schedule compliance pack96-block state of charge and scheduled versus actual, checksummed and exported as CSV or PDF.By design
Open accessOpen-access and captive supply recorded as their own energy sources and tariffs, so their cost is visible against grid supply.By design

Power intelligence flow

From a published price to a delivered block.

The steps a storage or hybrid asset goes through each day. Submission to the exchange stays with the operator.

Read prices

DAM, RTM, GDAM and HP-DAM prices by block.

Available

Forecast

Price, load and generation for the coming blocks, backtested.

By design

Optimise

Degradation-aware schedule and reservation price.

By design

Draft

A bid ladder saved as a draft, exportable.

By design

Review

An operator checks and approves the draft.

By design

Submit

Submission to the exchange.

By design

Reconcile

Scheduled versus actual, deviation estimated per block.

By design

Record

Draft generation, operator approvals and market runs kept in an audit log.

Available

Why it has to be built here

Details India's grid does not let you skip.

Scheduling, settlement and exchange prices all run on 96 blocks per IST day. A platform that thinks in hours or in UTC has to translate at every step, and translation is where schedules drift.

Forecast features include Indian holidays and calendar effects, because a festival day's load and price do not look like the Tuesday before it.

In India a plant that misses its schedule pays for it. Schedule adherence is treated as an operating objective, with exposure estimated per block, rather than as a report read at month end.

The platform runs on a self-hosted PostgreSQL system of record. Keeping data in India is a deployment choice you control, not a promise that depends on someone else's cloud region.

The EMS, edge agent and intelligence layer are developed in India, with no dependence on a foreign closed-source control plane.

Running against a schedule or a price?

Tell us your connection, your schedule obligations and your exchange exposure. We will show what the platform would plan, block by block, in shadow mode.