Myto / Industries

The same physics. A different objective.

A utility cares about schedule and grid. A factory cares about the bill and the line not stopping. A data center cares about the next hour being uneventful. Myto optimises for whichever one you own.

Utilities and renewable IPPs

Deliver to schedule, inside the connection.

Utility-scale solar and storage earn or lose money on schedule adherence, evacuation limits and the price of each block.

  • Export held inside the evacuation limit, with storage absorbing the surplus
  • Schedules on the 96-block day, scheduled versus actual tracked per block
  • DSM exposure estimated per block at your configured rate
  • IEX price data used in day-ahead and intraday planning
  • Northbound IEC 60870-5-104 and Modbus to existing SCADA

Frequency and reserve services exist in first form and are not NLDC-prequalified. Bid submission to the exchange is by design, subject to regulatory and exchange-member arrangements.

Commercial and industrial

A handful of intervals set the bill.

For most C&I sites, cost is decided by demand peaks and tariff windows. The opportunity is in not creating the peaks at all.

  • Peak shaving that acts before the peak is set
  • Solar self-consumption with export held at the limit
  • Time-of-use tariffs and billing aggregates by meter and category
  • Open-access and captive supply costed against grid supply
  • Carbon aggregates from the same metered data

Manufacturing

Production first. Energy around it.

A plant will not move a shift to save on power. Energy decisions have to fit around production, not the other way round.

  • Storage covers the evening peak so the line runs as planned
  • Energy by space, meter and category, so cost can be traced to where it was used
  • Rule-based alarms on feeders and assets
  • Demand response through OpenADR where the utility offers it

Data centers

Uneventful is the objective.

Load is high and steady, reliability is non-negotiable, and renewable sourcing is increasingly contractual.

  • Peak and tariff management with storage, inside strict SoC reserves
  • Renewable supply matched against load, block by block
  • Carbon aggregates for reporting
  • BACnet/IP and Modbus into existing building and electrical systems

Myto does not replace UPS, protection or backup systems. It manages energy around them.

EV charging

Charging without a new peak.

Chargers add large, unpredictable load. Unmanaged, they set the demand charge; managed, they soak up solar.

  • Charging steered toward solar surplus
  • Storage covering charging peaks at the connection
  • Chargers controlled through supported industrial interfaces today

OCPP integration is by design.

Microgrids

Many assets behind one connection.

Campuses, parks and townships run solar, storage, chargers and load behind a single point of connection.

  • Generation, storage and load coordinated by one edge controller
  • SoC reserve policy that protects critical load
  • Safe local behaviour when the cloud link is lost

Generator (DG) dispatch and islanded operation are by design.

Tell us what you operate. We will tell you where the value is.