Curtailment capture
Storage charges from generation above the export limit instead of that energy being spilled.
Myto / Solutions / Solar Intelligence
A solar plant produces whether or not the site, the line or the market wants it. Solar Intelligence decides where each megawatt goes: to load, into storage, onto the grid, or, only when nothing else is possible, curtailed.
Solar on its own
Solar + BESS
On a constrained connection the midday peak is lost unless something absorbs it. With storage controlled from the same model, that energy is held and released into the evening, when it is worth more.
Illustrative profile · not a measured plant
Storage charges from generation above the export limit instead of that energy being spilled.
Stored solar discharged into peak tariff windows or to cover the site's evening demand.
Storage used to keep delivered output close to a declared 15-minute schedule.
Share a month of generation and meter data with the connection limit. We will show where output is lost, and what storage or control would change.